Advice on approach and design

Hello,

We will be building pole house Eco friendly with pond to start aquaponis and nutrient reach watered permaculture land approach. ( In theory. Fingers crossed ). Fire rating BAL 40 with bunker. Defendable space of 10/30) Definitely challenging drop run north of 50°. Travelling North every 5m is an average of 3 drop.

Travelling Direction of Run is East to West ie ( contours ) average between 10 to 60 meter lengths with drops of 500mm to 1m

Looking forward to the challenge. Planning a plan to plan a plan for execution stage.

Any advice on approach for permaculture, and restoring and earth after construction?

Cheers

1